Qaghiliq (Yecheng) County

From Victims of 21st Century Concentration Camps
Jump to: navigation, search

Qaghiliq (Yecheng) County, Kashgar Prefecture (August 15, 2017) Legal system transformation through education school (法制教育转化学校) construction – Phase I School construction (13,000sqm), including a 5.6 MW hot water boiler and two 2.8 MW gas boilers, tap water system, surrounding wall 38 million bidchance.com

Qaghiliq (Yecheng) County, Kashgar Prefecture (August 15, 2017) Legal system transformation through education school (法制教育转化学校) construction – Phase II Supporting infrastructure, guard room, staff room, car garage, water supply and drainage network, heating pipes, ground hardening, surrounding wall, power supply, greenification 10 million bidchance.com

Qaghiliq (Yecheng) County, Kashgar Prefecture (August 15, 2017) Legal system transformation through education school and vocational training school (法制教育转化学校、职业技能培训学校) Design of a combined re-education and vocational training facility. Size: 82,000sqm. 1.7 million (design only, plus 0.15 million for the pre-construction geological survey) bidchance.com and bidchance.com

Qaghiliq (Yecheng) County, Kashgar Prefecture (December 23, 2016) Transformation through education class facility(教育转化班) Renovate and expand facility: office, teacher room, dormitory, canteen, toilets (1,500sqm). Install security fence, surrounding wall (120m, enclosed area 2,000sqm), guard facilities 0.19 million bidchance.com

Qaghiliq (Yecheng) County, Kashgar Prefecture (March 24, 2017) Video surveillance equipment for transformation through education center(教育转化中心) Video surveillance equipment 2.77 million xjyc.gov.cn